Artist's rendering

In May of 2004 the Merced Theatre Foundation selected the  firm  Wenell  Mattheis  Bowe Architects of  Stockton, California to  perform a comprehensive review of the Theatre. Structural,  mechanical and electrical systems were evaluated as well as a  thorough analysis of theatre systems. The Merced Theatre  Renovation Study was completed in September 2004 and  provides  the Foundation with the technical information  and cost analysis  needed to proceed with fund raising and ongoing  restoration  efforts. To view a list of consultants included in the Design Team  click here.

The following drawings are from the Renovation Study and show the proposed restoration. When the restoration is complete there  will be approximately 1,100 seats (20" - 21" wide). State-of-the- art  lighting and sound systems will be incorporated into the original  architectural scheme. The new plan also includes  additional toilet  facilities and will meet all current accessibility standards.      

floor plan
Proposed basement and first floor plan

second floor
Proposed second floor plan

north facade
North facade elevation

 

south facade
South facade elevation


arch
View of the Arch